top of page

Pocomo Point Runoff Control

  • Jun 23, 2023
  • 1 min read

The Pocomo Point Runoff Control Project is well underway:


  • Our goal is to control stormwater runoff and erosion at Pocomo Point parking lot area and help limit sediment entering the Harbor

  • The project is already happening, with the parking lot regrading and repair already completed for community usability

  • The next step is to implement our designs for water quality control and sedimentation prevention

  • Project will be installed and hopefully completed by end of fall 2023



Before regrading
Before regrading
After regrading
After regrading

Comments


bottom of page